Loading the Arcadia catalog…
THIRTEEN COORDINATED COLLECTIONS
Your complete package schedule
Selected products and finishes
Linked product names open details or a model search. Internal selections are described within this catalog. Click its picture to enlarge it. Reference images are labeled where an exact selected-product photo is not available.
| Component | Selected product / model | Finish |
|---|
Exact models by location
Detailed location entries clarify package summaries. They do not add duplicate quantities.
| Location / application | Manufacturer / model | Finish |
|---|
OPTIONAL KITCHEN AND BAR SELECTIONS
Coordinated options
Hoods, beverage refrigeration and wet-bar selections are options unless included in the issued base scope.
Appliance alternatives
Select one applicable alternative. Confirm fuel, opening, ventilation and plan fit before release.
| Product | Manufacturer / model | Finish / package fit |
|---|
COMMUNITY BASE SCOPE
Purchasing standards
Apply the community standard unless a selected package or issued option replaces it. Window coverings and blinds are options.
Structural Options
Options are plan specific. Released drawings govern dimensions, engineering and applicability.
| Plan | Option code | Description |
|---|
Stand Alone Options
Browse individual products from the current package selections. Matching a package does not establish an order code, price or plan compatibility. Confirm these with Purchasing.
Bathroom Shower and Accessory References
Manufacturer research is shown separately from released package selections. Confirm finish suffix, valve and individual package contents before ordering.
Appliance Options
RELEASED DRAWINGS CONTROL
Arcadia plan summary
Legacy plan 5038 references convert to 5538. Confirm the applicable elevation, configuration and revision when pricing.
PRINTABLE TRADE SCOPE
Trade checklists
These October 12 community scope sheets remain available for trade coordination. The October 17 package product schedule controls later package selections. Confirm differences with Purchasing before ordering.
Before release
Plans and quantitiesUse released drawings for room locations, takeoff, additions and deductions.
PlumbingConfirm compatible valves, rough-ins and distributor package details.
MaterialsConfirm made-to-order lead times, current availability, lots and dye lots.
Pricing and codesIdentify scope and exceptions in the returned bid. Purchasing coordinates option mapping and awarded prices.
Concept illustration. The written product schedule controls.